Complaint #1905 — Ashok Mehta
Filed: 31 Jul 2013 ·
Address: E-3/330, Area Colony, Bhopal
Flat A2/102 was booked with Akriti Green in the year 2008. The complete amount has been deposited with the builder. During booking, it was promised that the flat will be handed over in 2 Yrs. However, the flat is not yet handed over. After writing many e mails to various levels including CMD, the company is now ready to handover the said fat. During the final inspection following observations were found:-
(a)Floor tiles have not been placed symmetrically.
(b)Bathroom door is banging with the toilet seat.
(c)Whitewash has not been done properly and neatly.Apropos, one more coat of the same is required.
(d)There is problem of seepage in the rooms.
Pts from a-c can be rectified but pt d pertaining to seepage is not at all acceptable. It only shows poor workmanship in the constr quality.
Demands :
(a)I would like the company to rectify the defects and handover the flat by 15Aug 13
(b)Compensation-Rs5 Lakhs